Wed, 07 Aug 2013 15:34:24 +0300 Budiarto Herman BareHandoverAlgorithm for LTE to simulate absence of handover algorithm
Wed, 07 Aug 2013 11:42:53 +0300 Budiarto Herman Handover management SAP interface and A2/RSRQ-based handover algorithm
Wed, 07 Aug 2013 11:17:46 +0300 Budiarto Herman Draft update to UE RRC state diagram
Mon, 05 Aug 2013 13:47:41 +0300 Budiarto Herman Minor code formatting of lena-dual-stripe
Mon, 05 Aug 2013 13:40:55 +0300 Budiarto Herman Added initial cell selection to EPC-enabled simulations in lena-dual-stripe example
Fri, 02 Aug 2013 19:03:01 +0300 Budiarto Herman Restructured the initiation of cell selection, so that UeNetDevice does not directly interact with PHY
Fri, 02 Aug 2013 14:39:40 +0300 Budiarto Herman Restrict the CQI generation in UE PHY
Fri, 02 Aug 2013 14:38:56 +0300 Budiarto Herman Moved LteHelper::Connect functionality into LteHelper::Attach
Wed, 31 Jul 2013 23:28:46 +0300 Budiarto Herman Separated RSRP and RSRQ calculation in LteUePhy
Wed, 31 Jul 2013 21:24:45 +0300 Budiarto Herman Renamed some variables in LteUePhy
Wed, 31 Jul 2013 16:07:30 +0300 Budiarto Herman Renamed some UE measurements variables
Wed, 31 Jul 2013 14:28:06 +0300 Budiarto Herman Updated documentation for LteHelper::Attach function family
Wed, 31 Jul 2013 13:50:46 +0300 Budiarto Herman Renamed LTE measurement mapping function for consistency
Tue, 30 Jul 2013 16:41:23 +0300 Budiarto Herman Testing documentation for LTE cell selection
Mon, 29 Jul 2013 18:24:32 +0300 Budiarto Herman Updated the structure of initial cell selection documentation
Mon, 29 Jul 2013 18:23:56 +0300 Budiarto Herman SIB2 trace source
Mon, 29 Jul 2013 11:38:13 +0300 Budiarto Herman Removed PLMN from LTE cell selection criteria
Sun, 28 Jul 2013 08:28:07 +0300 Budiarto Herman Evaluation of cell selection criteria
Sun, 28 Jul 2013 08:17:35 +0300 Budiarto Herman Updated UE measurements and initial cell selection documentation
Wed, 24 Jul 2013 18:02:08 +0300 Budiarto Herman Fixed lte-x2-handover-measures test suite by increasing the rate of measurement reports
Mon, 22 Jul 2013 20:41:34 +0300 Budiarto Herman Using ObjectFactory in LteHelper for LteUeNetDevice
Mon, 22 Jul 2013 12:39:11 +0300 Budiarto Herman Generic (not eNodeB-specific) helper functions Attach and Connect
Mon, 22 Jul 2013 11:20:27 +0300 Budiarto Herman Moved several cell selection functionality from UE PHY to RRC
Mon, 22 Jul 2013 11:19:31 +0300 Budiarto Herman Reverted position of SetChannel in LteHelper InstallDevice functions
Fri, 19 Jul 2013 14:34:25 +0300 Budiarto Herman Merged an obsolete branch
Fri, 19 Jul 2013 14:32:12 +0300 Budiarto Herman Reverted changes from parent revision 9974
Fri, 19 Jul 2013 14:23:04 +0300 Budiarto Herman Several fixed to LTE initial cell selection
Fri, 19 Jul 2013 12:49:02 +0300 Budiarto Herman Few updates to documentation
Wed, 17 Jul 2013 15:12:01 +0300 Budiarto Herman DL EARFCN attribute for UE
Tue, 16 Jul 2013 09:43:01 +0300 Budiarto Herman Attempt to initial synchronization, cell search, MIB and SIB1
Wed, 10 Jul 2013 19:17:00 +0300 Budiarto Herman Attempt to shift MIB closer to Idle mode
Wed, 10 Jul 2013 14:59:00 +0300 Budiarto Herman Updated UE measurements documentation
Tue, 09 Jul 2013 21:35:43 +0300 Budiarto Herman UE measurements fixes and tests for reportOnLeave and haveMeasResultNeighCells
Tue, 09 Jul 2013 17:31:04 +0300 Budiarto Herman Time-to-trigger implementation and tests for Event A3, A4, and A5
Tue, 09 Jul 2013 14:55:30 +0300 Budiarto Herman UE measurements time-to-trigger tests for Event A1 and A2
Tue, 09 Jul 2013 14:53:20 +0300 Budiarto Herman Fixed UE measurements timing issue (when reportInterval > 200 ms, or when time-to-trigger < 200 ms)
Mon, 08 Jul 2013 23:11:37 +0300 Budiarto Herman Time-to-trigger implementation and tests for Event A1
Sat, 06 Jul 2013 15:14:33 +0300 Budiarto Herman Recombined UE measurements tests into one file
Thu, 04 Jul 2013 20:46:20 +0300 Budiarto Herman Refactoring LteUeRrc
Thu, 04 Jul 2013 20:28:30 +0300 Budiarto Herman Fixed a bug in UE measurements test
Thu, 04 Jul 2013 14:22:42 +0300 Budiarto Herman Removed BuildMeasConfig from .h (already removed from .cc before)
Wed, 03 Jul 2013 18:18:59 +0300 Budiarto Herman Reduced UE measurements test execution length
Wed, 03 Jul 2013 17:30:10 +0300 Budiarto Herman Added hysteresis tests to UE measurements test suites
Wed, 03 Jul 2013 15:40:08 +0300 Budiarto Herman Clarification comments on LTE SI transmission schedule
Wed, 03 Jul 2013 15:10:08 +0300 Budiarto Herman Additional tests for UE measurements handover test suite
Wed, 03 Jul 2013 14:09:58 +0300 Budiarto Herman Split UE measurements tests into multiple test suites (still problem with operator redefinition)
Tue, 02 Jul 2013 22:18:03 +0300 Budiarto Herman Changes based on peer review: typos in documentation, conversion functions for Hysteresis and a3-Offset, separated constructor implementation of ReportConfigEutra, and removed dead code in LteUeRrc.
Tue, 02 Jul 2013 21:34:14 +0300 Budiarto Herman Fixed Event A5 bug
Tue, 02 Jul 2013 10:23:16 +0300 Budiarto Herman Preliminary design and user documentation of LTE initial cell selection
Fri, 28 Jun 2013 12:31:30 +0300 Budiarto Herman Preliminary UE measurements handover test case
Fri, 28 Jun 2013 10:24:33 +0300 Budiarto Herman A few fixes to UE measurements test cases
Thu, 27 Jun 2013 13:23:02 +0300 Budiarto Herman Event A5 implementation and test cases
Thu, 27 Jun 2013 10:08:32 +0300 Budiarto Herman Fixed conversion of A3 offset
Wed, 26 Jun 2013 17:01:46 +0300 Budiarto Herman UE measurements piecewise test case 2
Tue, 25 Jun 2013 17:54:49 +0300 Budiarto Herman Constructor for ReportConfigEutra
Tue, 25 Jun 2013 17:06:16 +0300 Budiarto Herman Fixed typo
Tue, 25 Jun 2013 14:43:12 +0300 Budiarto Herman UE measurements test case for Event A3 and A4
Tue, 25 Jun 2013 14:43:07 +0300 Budiarto Herman Event A3 implementation and general update to event-based triggering criteria
Tue, 25 Jun 2013 14:41:32 +0300 Budiarto Herman Removed assumption of Event A2 and A4 in LteEnbRrc upon receiving measurement report
Mon, 24 Jun 2013 17:51:15 +0300 Budiarto Herman Fixed missing UE measurements configuration in lena-x2-handover-measures example
(0) -10000 -3000 -1000 -300 -100 -60 +60 +100 +300 +1000 tip