Mercurial
Mercurial
>
tomh
>
ns-3-dev-spectrum-wifi
/ graph
summary
|
shortlog
|
changelog
| graph |
tags
|
bookmarks
|
branches
|
files
|
zip
|
gz
|
bz2
|
help
less
more
|
(0)
-10000
-3000
-1000
-300
-100
-60
+60
+100
+300
+1000
tip
Find changesets by keywords (author, files, the commit message), revision number or hash, or
revset expression
.
The revision graph only works with JavaScript-enabled browsers.
Renamed some variables in LteUePhy
2013-07-31, by Budiarto Herman
Renamed some UE measurements variables
2013-07-31, by Budiarto Herman
Updated documentation for LteHelper::Attach function family
2013-07-31, by Budiarto Herman
Renamed LTE measurement mapping function for consistency
2013-07-31, by Budiarto Herman
Testing documentation for LTE cell selection
2013-07-30, by Budiarto Herman
Updated the structure of initial cell selection documentation
2013-07-29, by Budiarto Herman
SIB2 trace source
2013-07-29, by Budiarto Herman
Removed PLMN from LTE cell selection criteria
2013-07-29, by Budiarto Herman
Evaluation of cell selection criteria
2013-07-28, by Budiarto Herman
Updated UE measurements and initial cell selection documentation
2013-07-28, by Budiarto Herman
Fixed lte-x2-handover-measures test suite by increasing the rate of measurement reports
2013-07-24, by Budiarto Herman
Using ObjectFactory in LteHelper for LteUeNetDevice
2013-07-22, by Budiarto Herman
Generic (not eNodeB-specific) helper functions Attach and Connect
2013-07-22, by Budiarto Herman
Moved several cell selection functionality from UE PHY to RRC
2013-07-22, by Budiarto Herman
Reverted position of SetChannel in LteHelper InstallDevice functions
2013-07-22, by Budiarto Herman
Merged an obsolete branch
2013-07-19, by Budiarto Herman
Reverted changes from parent revision 9974
2013-07-19, by Budiarto Herman
Several fixed to LTE initial cell selection
2013-07-19, by Budiarto Herman
Few updates to documentation
2013-07-19, by Budiarto Herman
DL EARFCN attribute for UE
2013-07-17, by Budiarto Herman
Attempt to initial synchronization, cell search, MIB and SIB1
2013-07-16, by Budiarto Herman
Attempt to shift MIB closer to Idle mode
2013-07-10, by Budiarto Herman
Updated UE measurements documentation
2013-07-10, by Budiarto Herman
UE measurements fixes and tests for reportOnLeave and haveMeasResultNeighCells
2013-07-09, by Budiarto Herman
Time-to-trigger implementation and tests for Event A3, A4, and A5
2013-07-09, by Budiarto Herman
UE measurements time-to-trigger tests for Event A1 and A2
2013-07-09, by Budiarto Herman
Fixed UE measurements timing issue (when reportInterval > 200 ms, or when time-to-trigger < 200 ms)
2013-07-09, by Budiarto Herman
Time-to-trigger implementation and tests for Event A1
2013-07-08, by Budiarto Herman
Recombined UE measurements tests into one file
2013-07-06, by Budiarto Herman
Refactoring LteUeRrc
2013-07-04, by Budiarto Herman
Fixed a bug in UE measurements test
2013-07-04, by Budiarto Herman
Removed BuildMeasConfig from .h (already removed from .cc before)
2013-07-04, by Budiarto Herman
Reduced UE measurements test execution length
2013-07-03, by Budiarto Herman
Added hysteresis tests to UE measurements test suites
2013-07-03, by Budiarto Herman
Clarification comments on LTE SI transmission schedule
2013-07-03, by Budiarto Herman
Additional tests for UE measurements handover test suite
2013-07-03, by Budiarto Herman
Split UE measurements tests into multiple test suites (still problem with operator redefinition)
2013-07-03, by Budiarto Herman
Changes based on peer review: typos in documentation, conversion functions for Hysteresis and a3-Offset, separated constructor implementation of ReportConfigEutra, and removed dead code in LteUeRrc.
2013-07-02, by Budiarto Herman
Fixed Event A5 bug
2013-07-02, by Budiarto Herman
Preliminary design and user documentation of LTE initial cell selection
2013-07-02, by Budiarto Herman
Preliminary UE measurements handover test case
2013-06-28, by Budiarto Herman
A few fixes to UE measurements test cases
2013-06-28, by Budiarto Herman
Event A5 implementation and test cases
2013-06-27, by Budiarto Herman
Fixed conversion of A3 offset
2013-06-27, by Budiarto Herman
UE measurements piecewise test case 2
2013-06-26, by Budiarto Herman
Constructor for ReportConfigEutra
2013-06-25, by Budiarto Herman
Fixed typo
2013-06-25, by Budiarto Herman
UE measurements test case for Event A3 and A4
2013-06-25, by Budiarto Herman
Event A3 implementation and general update to event-based triggering criteria
2013-06-25, by Budiarto Herman
Removed assumption of Event A2 and A4 in LteEnbRrc upon receiving measurement report
2013-06-25, by Budiarto Herman
Fixed missing UE measurements configuration in lena-x2-handover-measures example
2013-06-24, by Budiarto Herman
Copied features between handover examples
2013-06-24, by Budiarto Herman
UE measurements piecewise test case 1 for Event A2
2013-06-24, by Budiarto Herman
Fixed missing UE measurements configuration in lte-x2-handover-measures test suite
2013-06-24, by Budiarto Herman
Minor coding style fixes in handover examples
2013-06-24, by Budiarto Herman
Updated UE measurements documentation
2013-06-24, by Budiarto Herman
UE measurements piecewise test case 1 for Event A1
2013-06-21, by Budiarto Herman
Complete report interval implementation (except the SPARE* options)
2013-06-21, by Budiarto Herman
Removed assert statement rejecting configuration of Event A1
2013-06-21, by Budiarto Herman
Attributes for configuring layer 3 filtering
2013-06-21, by Budiarto Herman
less
more
|
(0)
-10000
-3000
-1000
-300
-100
-60
+60
+100
+300
+1000
tip