Mercurial
Mercurial
>
ns-3.24
/ graph
summary
|
shortlog
|
changelog
| graph |
tags
|
bookmarks
|
branches
|
files
|
zip
|
gz
|
bz2
|
help
less
more
|
(0)
-3000
-1000
-120
+120
+1000
tip
Find changesets by keywords (author, files, the commit message), revision number or hash, or
revset expression
.
The revision graph only works with JavaScript-enabled browsers.
merge
2012-12-04, by Nicola Baldo
Implement real DoSendRrcConnectionSetupCompleted
2012-12-04, by Lluis Parcerisa
Remove Start method with a RBS. This is only needed in the RlcSm
2012-12-04, by Manuel Requena
removed spurious LteUePhy::m_enbCellId; fixed bug in LteEnbRrc::GetNewSrsConfigurationIndex ()
2012-12-04, by Nicola Baldo
Bug fix release info on RR allocation memory and remove NS_FATAL_ERROR on HARQ when HO
2012-12-04, by Marco Miozzo
merge and correct merge bug on test-lte-rrc
2012-12-04, by Marco Miozzo
merge
2012-12-04, by Marco Miozzo
UeRelease support at LteEnbMac and schedulers (PF and RR)
2012-12-04, by Marco Miozzo
added LteEnbRrc::AdmitHandoverRequest attribute; implemented handling of X2 HO prep failure
2012-12-04, by Nicola Baldo
fixed compilation error due to previous merge
2012-12-03, by Nicola Baldo
merge
2012-12-03, by Marco Miozzo
merge
2012-12-03, by Marco Miozzo
Introduces RACH procedures in the schedulers and UL grant at PHY layer
2012-12-03, by Marco Miozzo
added missing files
2012-12-03, by Nicola Baldo
merge
2012-12-03, by Nicola Baldo
merge
2012-11-30, by Manuel Requena
Add support of HandoverPreparationFailure primitive in RRC
2012-11-30, by Manuel Requena
Add HandoverPreparationFailure X2 message header
2012-11-30, by Manuel Requena
Add HandoverPreparationFailure message
2012-11-30, by Manuel Requena
Add HandoverPreparationFailure primitive to X2 SAP
2012-11-30, by Manuel Requena
dynamic connection of RadioBearerStatsCalculator so it works properly with handover
2012-12-03, by Nicola Baldo
cancel pending events upon RLC disposal
2012-12-03, by Nicola Baldo
merge
2012-11-30, by Nicola Baldo
Rrc header: implementation of RrcConnectionReestablishment, RrcConnectionReestablishmentRequest, RrcConnectionReestablishmentComplete.
2012-11-30, by Lluis Parcerisa
Document ASN.1 encoding of RRC IE's
2012-11-30, by Lluis Parcerisa
added LteUeRrcSapProvider::CompleteSetup ()
2012-11-30, by Nicola Baldo
added stub of LteRrcProtocolReal with corresponding tests
2012-11-30, by Nicola Baldo
remove MacSapProvider instances in LteEnbMac upon RemoveUe()
2012-11-29, by Nicola Baldo
merge
2012-11-29, by Nicola Baldo
Development of RRC headers based on the RRC SAP
2012-11-29, by Lluis Parcerisa
release UE context at EpcEnbApplication upon X2 UE CONTEXT RELEASE
2012-11-29, by Nicola Baldo
added more test cases to lte-x2-handover test
2012-11-29, by Nicola Baldo
fixed regression in lte-epc-e2e-data test
2012-11-29, by Nicola Baldo
added S1 path switch + S11 modify bearer for X2 handover
2012-11-29, by Nicola Baldo
merge
2012-11-28, by Nicola Baldo
Add support for MME UE S1AP ID in HandoverRequest X2 primitive
2012-11-27, by Manuel Requena
merge
2012-11-27, by Manuel Requena
Add support of ResourceStatusUpdate X2 primitive in RRC
2012-11-27, by Manuel Requena
Add ResourceStatusUpdate X2 message header
2012-11-27, by Manuel Requena
Add ResourceStatusUpdate message
2012-11-27, by Manuel Requena
Add ResourceStatusUpdate primitive to X2 SAP
2012-11-27, by Manuel Requena
removed obsolete S1BearerSetupRequest method from EpcEnbS1Sap
2012-11-28, by Nicola Baldo
added MME with simulated S1AP and S11 interfaces
2012-11-28, by Nicola Baldo
merge
2012-11-27, by Marco Miozzo
Refine test vector values in lena-harq test
2012-11-27, by Marco Miozzo
Bug-fix LCs management with new transmission in RrFfMacScheduler::DoSchedDlTriggerReq and BSR report in RrFfMacScheduler::UpdateDlRlcBufferInfo
2012-11-27, by Marco Miozzo
added data plane test conditions to lte-x2-handover test
2012-11-26, by Nicola Baldo
added lte-x2-handover test suite
2012-11-23, by Nicola Baldo
merge
2012-11-23, by Nicola Baldo
fix compilation error with gcc-4.7
2012-11-23, by Nicola Baldo
check bearer structs in lte-rrc test
2012-11-23, by Nicola Baldo
fixed positions in lena-x2-handover
2012-11-22, by Nicola Baldo
X2 handover working on the control plane
2012-11-22, by Nicola Baldo
merge
2012-11-22, by Nicola Baldo
Add support of Load Information primitive in RRC
2012-11-20, by Manuel Requena
Add Load Informatin X2 message header
2012-11-20, by Manuel Requena
Add Load Information X2 message
2012-11-20, by Manuel Requena
Add Load Information primitive to X2 SAP
2012-11-20, by Manuel Requena
merged lena-dev and lena-epc
2012-11-22, by Nicola Baldo
improved LTE Random Access model
2012-11-20, by Nicola Baldo
Simplify handover management for multiple eNBs (i.e. different cellIds)
2012-11-14, by Manuel Requena
merge
2012-11-05, by Nicola Baldo
management of the bearers in the X2 messages
2012-10-31, by Manuel Requena
more LTE RRC test cases
2012-11-05, by Nicola Baldo
implemented UeManager::GetErabList ()
2012-11-02, by Nicola Baldo
merge
2012-11-02, by Nicola Baldo
new LTE RRC model
2012-10-30, by Nicola Baldo
Add UE Context Release primitive to X2 SAP
2012-10-08, by Manuel Requena
Add UE Context Release X2 message
2012-10-08, by Manuel Requena
merge
2012-09-29, by Manuel Requena
merge
2012-08-01, by Manuel Requena
merge
2012-07-30, by Manuel Requena
merge
2012-07-20, by Manuel Requena
fixed doxygen in lte-as-sap.h
2012-08-28, by Nicola Baldo
merge
2012-08-01, by Manuel Requena
Add some IEs to the X2 message headers
2012-08-01, by Manuel Requena
Add some IEs to the X2 message headers
2012-08-01, by Manuel Requena
Use new parameters of the X2 SAP
2012-07-20, by Manuel Requena
Introduced HARQ processes timers in RR and PF schedulers
2012-11-28, by Marco Miozzo
Update User Documentation on the DL RSRP/SINR traces
2012-11-27, by Marco Miozzo
Bug-fix lena-profiler update to HybridBuildingsPropagationLossModel
2012-11-27, by mmiozzo
merge
2012-11-27, by mmiozzo
Change RSRQ stats for average SINR ones
2012-11-27, by Marco Miozzo
Update RSRP and RSRQ evaluation (RSRQ as average SINR)
2012-11-13, by Marco Miozzo
merge
2012-11-12, by Nicola Baldo
minor fixes on Rsrp and interference traces
2012-11-12, by Nicola Baldo
PhyStats calculator implementation. All code needed added to LteHelper. Prototype order changed in order to respect cellId,IMSI, rnti
2012-11-06, by Jaume Nin
Fix new building api
2012-11-21, by Manuel Requena
first draft of the documentation for the PHY traces
2012-11-15, by Jaume Nin
Fix some errors
2012-11-14, by Manuel Requena
Fix JIRA LENA-284, cellId was not being reported in some callbacks and in some situations cellId was being reported 0, now fixed and reporting always correct cellId
2012-11-14, by Jaume Nin
Profiling scripts updated and documentation fixed
2012-11-14, by Jaume Nin
fixed valgrind error in EpcEnbApplication
2012-11-09, by Nicola Baldo
Introduce sanity checks on DoSchedUlTriggerReq of RR and PF schedulers
2012-11-08, by Marco Miozzo
merge
2012-11-08, by Marco Miozzo
Update HARQ documentation (design and test)
2012-11-08, by Marco Miozzo
Bug-fix solvin desynchronization of UL HARQ processes during retransmissions
2012-11-08, by Marco Miozzo
fixed valgrind error in LteUeRrc
2012-11-07, by Nicola Baldo
Run check-style and polish logs on RR and PF schedulers
2012-11-06, by Marco Miozzo
merge
2012-11-06, by Marco Miozzo
Bugs-fix: avoid multiple retransmission attempts per UE and reorder the RLC PDUs list for retrasmission both in RR and PF schedulers
2012-11-06, by Marco Miozzo
minor update to lte-user docs
2012-11-06, by Nicola Baldo
Dispose EpcUeNas within LteUeNetDevice
2012-11-06, by Nicola Baldo
Updates on LCs and BSRs management on RR and PF schedulers
2012-11-05, by mmiozzo
Merge with lena-pem 9124:b4fcfc26791f (HARQ)
2012-11-05, by mmiozzo
Add lte-harq test suite and polishing of code
2012-11-02, by Marco Miozzo
Remove redundant tbSize set in PfFfMacScheduler::DoSchedUlTriggerReq
2012-10-31, by Marco Miozzo
Bug-fix: Update DoSchedUlTriggerReq of both RR and PF for avoiding allocation of resources to UEs with no data to send
2012-10-31, by Marco Miozzo
Update PfFfMacScheduler::DoSchedDlTriggerReq for maintaining rbgMap internal variable up-to-date
2012-10-30, by Marco Miozzo
Add LteHarq test case, draft version (work in progress)
2012-10-30, by Marco Miozzo
LteMiErrorModel update tables of MI vs SINR for considering retx cases with low SINR
2012-10-30, by Marco Miozzo
Bug-fix LteHarqPhy::UpdateHarqProcessInfo sizes in bits instead of bytes
2012-10-30, by Marco Miozzo
Bug-fix in RR and PF: update RV field in different harq retx
2012-10-29, by Marco Miozzo
Update RR and PF schedulers for avoiding the allocation of UEs that do not have HARQ processes available for transmitting
2012-10-26, by Marco Miozzo
Bug-fix DoSchedDlTriggerReq:startRbg both in RR and PR erroneous initialization
2012-10-25, by Marco Miozzo
Add trace sources for DL RSRP/RSRQ (dummy values, TBD), UL SRS and interference power traces
2012-10-25, by Marco Miozzo
Update HARQ Design documentation with final implementation issues
2012-10-19, by Marco Miozzo
Limit HARQ buffers in LteHarqPhy (in order to limit buffers size in no HARQ mode)
2012-10-19, by Marco Miozzo
Bug-fix coded bit computation in LteSpectrumPhy
2012-10-18, by Marco Miozzo
Update LteMiErrorModel with BLER curves for HARQ retx ( MCS0 rv2 and rv3 still lacks)
2012-10-18, by Marco Miozzo
less
more
|
(0)
-3000
-1000
-120
+120
+1000
tip